Ship repair / docked

BINTANG MUTIARA XX Repaired

The repairs took place 30th  December  2015 to 28th  january 2016 at PT Usda Seroja Jaya Batam Shipyard, Indonesia. Repair works include body works, repainting, replating, engine overhaul.

Ship repair
Posted on May 18, 2016 .