Ship repair / docked

TB BINTANG MUTIARA XIII Repaired

 

The repairs took place 23thJune 2016 to19th  July 2016 at PT Usda Seroja Jaya Batam Shipyard, Indonesia. Repair works include body works, repainting, replating, marger test, Calibration Anchor  and engine overhaul.

Ship repair
Posted on August 12, 2016 .