Ship repair / docked

TB. BINTANG MUTIARA XXI Repaired

The repairs took place 10th June 2016 to 24th  June 2016 at PT Usda Seroja Jaya Batam Shipyard, Indonesia. Repair works include body works, repainting, replating, marger test, Calibration Anchor  and engine overhaul.

Ship repair
Posted on August 12, 2016 .